Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

302 WEST

by MODERN SPAACES VENTURES · 122 homes · 2.01 acres · 1 tower · Anekal

Delivered late Completed: the builder filed for completion on 7 May 2024, 309 days after the date it first promised.

Location report

At a glance

Was it on time?Delivered late
Completed late

The builder filed for completion on 7 May 2024, 309 days after the date it first promised.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?Less crowded
61 homes per acre

Similar projects within 3 km: 70 per acre. 55% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?Unknown
Not stated

The RERA page doesn't say.

What is the builder's record?5 due so far
20% on time

Of its 6 RERA projects in Bengaluru Urban: 1 delivered on time, 4 late (after the date first promised), 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started22 Mar 2021
  2. Approved by RERA4 Aug 2021
  3. Completion filed7 May 2024

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

3BHK
  • 1,006 sq ft55 homes93.5 m²
  • 892 sq ft8 homes82.9 m²
  • 1,033 sq ft8 homes96.0 m²
  • 783 sq ft4 homes72.7 m²
  • and 12 homes in other sizes
Typically 64 m² land share · 33 m² balcony/terrace · 1 parking space
87 homes · 71% of the project
2BHK
  • 725 sq ft28 homes67.4 m²
  • 684 sq ft7 homes63.5 m²
Typically 48 m² land share · 25 m² balcony/terrace · 1 parking space
35 homes · 29% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

302 West3 floors

302 West: 122 homes

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project61
Typical within 3 km (86)70
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project55%
Typical within 3 km (88)61%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
2.01 acres

8,119 m²

Ground covered by buildings
45% of the land

3,690 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 6 RERA projects of MODERN SPAACES VENTURES on the map

The company

Registered as
MODERN SPAACES VENTURES
Type
Partnership Firm
PAN
ABNFM0253F

The land is owned together with others (a joint development), including ITTINA PROPERTIES PRIVATE LIMITED.

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹22.0 cr
Construction
₹27.6 cr
Total project cost
₹49.6 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station9.81 kmReliable
  • Nearest railway station8.08 kmReliable
  • Bus stops within 500 m2Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km2Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)1.3 kmCaveat

Hospitals

  • Nearest hospital0.92 kmCaveat

Schools

  • Schools in pincode 562125 (UDISE+ census)91Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km3Caveat
  • Schools with library + playground + ICT lab (1 km)1Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionSarjapura PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)13.74 kmReliable
  • Nearest sewage treatment plant4.96 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)13.83 kmCaveat
  • Nearest commercial-airport runway36.87 kmReliable
  • Distance to runway approach-path proxy35.17 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (12.85846, 77.76959), 2026-10-24. Each figure's source and caveat are in the full report.